Working with the Frame Damage Worksheet

The Frame Damage Worksheet feature creates a frame diagram and has fields where you can enter dimensional corrections and repair hours, (including set-up hours). CCC ONE automatically calculates the labor cost. You can also enter a note, and add the labor costs to the top or the bottom of the estimate.

  1. Open the workfile.
  2. Select the Estimate tab, and then select the Lines tab.
  3. Select the MOTOR tab.
  4. Select the Frame > Frame Sheet from the Operations toolbar. The Frame Damage screen opens.
  5. Enter the frame labor information in the screen.
  6. Select Insert to Top of Estimate or Append to Estimate to add the line entry to the estimate.
  7. Select Save or Save and Close to save the information in the workfile.

Overview

Frame Sheets and Specifications

Screen Description

Frame Damage Screen

 

 

 

 

 

 

© 2024 CCC Intelligent Solutions Inc. All Rights Reserved.
CCC, CCC ONE, and the CCC Logo are registered trademarks of CCC Intelligent Solutions Inc. 9/16/2024 - 4:35 PM